The project scheduling stages are outlined below:
Based on the project scope, design and develop the TBS (Task-Breakdown Structure).
Identify the project-related tasks.
Evaluate the approximate time required for each and every task
Allocation of resources
Analyze the detailed schedule
Monitor and govern the schedule